Job Description

Skills Required As in the attached Justification in detail.

To avoid reworks due to Secondary Supports (welding, painting, inspection) and save the associated cost, it is a must to install the E&I secondary supports on the platform deck prior to blasting/painting of the full deck. As per current Practice, secondary supports are installed at a late stage as they are not modelled by Engineering. Hence these are designed, fabricated & installed in Situ by the construction team after major installations have progressed substantially (e.g. primary supports and mechanical pipes/structures, Main Cable Ladder etc) to ensure clash-free installation to the extent possible by visualizing the proper route, location, type and dimension. As an improvement initiative, we decided to model the secondary supports by designers/draftsman similar to primary supports and reflected in related drawings; however at Management Level it was agreed to handle this task of Construction Engineering by E&I Yard (please refer attached Division of Responsibilities between Engg and E&I Yard). On the recently concluded CRPO's, it is estimated that approx. 6M AED over-run was caused due to reworks related to Secondary supports, which can be saved on future projects. #J-18808-Ljbffr

Beware of fraud agents! do not pay money to get a job

MNCJobsGulf.com will not be responsible for any payment made to a third-party. All Terms of Use are applicable.


Job Detail

  • Job Id
    JD1810009
  • Industry
    Not mentioned
  • Total Positions
    1
  • Job Type:
    Full Time
  • Salary:
    Not mentioned
  • Employment Status
    Permanent
  • Job Location
    Dubai, United Arab Emirates
  • Education
    Not mentioned