1. Reporting to QA/QC Manager.
2. Studying the Project specifications in detail for the complete scope, materials, work execution, tests etc. required for the project.
3. Review all the approved documents such as Method statements, Project Quality Plan, Drawings, prior to the commencement of works on the site.
4. Monitor site activities according to Project Quality Plan and Inspection and Test Plan, Project Specifications and Method Statements.
5. Ensure that all work is carried out in a controlled manner.
6. Communication with third-party Independent testing companies
7. Attend the concrete trial mixes at the RMC Batching plant upon design mix approval and witness all the tests that are carried out on the fresh concrete. Advise the RMC supplier/Approved third party testing Laboratory for the sampling of test specimens as per the project requirements.
Submit the Preliminary trial mix report to the consultant in coordination with the Document controller.
Witness 7 days and 28 days testing with the consultant for the trial mix conducted.
8. Report all Quality issues to the Quality Manager
9. Submit the daily site reports for the all daily works executed, on the next day before 09:00am. Daily report shall include all the tasks carried out, materials received on the site etc.
Highlight the obstructions encountered on the project, such as utilities, failure of Dewatering system etc. and also Equipment/manpower Idle hours (if any) working on the site
10. Ensure the construction materials such as Reinforcement steel, Spacers, Tie wire, Cement etc. shall be protected well.
11. Carry out the inspections for each activity and record in the inspection checklist.
12. Issue Work Inspections one day in advance and obtain the approval within 5 days of completion of the activity.
13. The installation records for any activity shall be submitted within 24hrs. and the signed records shall be maintained.
14. Ensure that all the approved documents, records are available in both hard and soft copies. Well maintained filing system shall be followed on the sites.
15. For any minor nonconformances by Execution team/subcontractor/supplier, site observation report shall be issued and if the nonconformance is major internal Nonconformance report shall be issued and shall be closed out within the time frame set for close out. Report shall be sent to Quality Dept. for record.
16. Close out external NCRs received from the client without delay.
17. Ensure that well organized concrete check point is available on the site.
18. Ensure sampling of materials (concrete/reinforcement) is carried out in accordance with the project specifications or as agreed with the Engineer.
19. Follow up for test results in coordination with HO and submit on time.
20. Ensure that all the Equipments/tools are calibrated, and valid calibration certificates are available on the site.
21. Prepare and submit Monthly Quality reports to Quality Dept. HO on 3rd day of every month.
22. Monitor concrete and Reinforcement consumption on daily basis and report to Quality Dept. HO.
23. Ensure project handing over documents/records are submitted as in accordance with the project specifications.
24. Ensure all the Quality Documents/records are handed over to HO after the completion of the project.
Submit your resume to foundationcareer2018 (at) gmail (dot) com
Job Type: Full-time
Pay: AED7,000.00 - AED12,000.00 per month
Education:
• Bachelor's (Required)
Experience:
• Piling: 3 years (Preferred)
MNCJobsGulf.com will not be responsible for any payment made to a third-party. All Terms of Use are applicable.