About Al Tariq:Established in 2012, AL TARIQ is the first UAE-based manufacturer of precision-guided systems for conventional aerial munitions. AL TARIQ is a regional leader in precision-guided munition kits, matching the quality of global manufacturers at a smaller and faster scale. AL TARIQ leverages the latest advanced technologies in the field of optics and propulsion systems and has built up its engineering expertise through continuous innovation to deliver new products as well as production process improvements.Key Responsibilities:
Maintain procurement types between production types and Phantom types.
Request and collect routing info from production, and create and maintain routings on SAP.
Provide and assist inputs into manufacturing strategy. Facilitate in creation of production schedule. Help with capacity planning.
Co-ordinate the identification for scrap/rework on production floor. Evaluate the impact of ECP's on production planning.
Provide regular, pro-active visibility on future material shortages. Expediting on critical shortages.
Release, sign of off PDI, on correct versions. Attach deviation when applicable. Check kit availability status.
Create Production Orders from planned orders per project. Confirm, deliver and close Production orders.
Failure reporting and corrective action via QNF. Re-issue of stock to production. Monitor of items routed for rework.
Interface with the store on kit release and inspection procedures.
Execute necessary actions to implement ECP's as approved by PCMB, concerning product changes.
Controlling WIP store and stock levels, in between production orders.
Progress monitoring and reporting. Create visibility on production floor of risks threatening the successful completion of the MPS.
Production cost reporting, do cost roll-ups. Report on deviations/ variances.
Experience & Education:
2 years of experience in procurement - production planning preferably in a manufacturing environment OR Fresh graduate Industrial Engineering
In-depth experience in production planning is a requirement.
Preference will be given to candidates with SAP experience.
A good understanding of the MRP algorithm is a requirement
Key Skills:
The ability to create detail action plans for Production.
The ability to implement and monitor action plans.
The ability to execute simultaneous tasks effectively.
The ability to consistently perform under pressure